In addition to the street shutdown, the five-year, $802 million ”Connecting Miami” reconstruction project of I-395 — double-decking a section of the highway, repaving a stretch of I-95 and building a spider-like bridge over Biscayne Boulevard — will mean lane closures, traffic shifts and detours.
A key downtown Miami street is about to close forever. Are you ready for it?
Anterior
Anterior
The $1 billion Waldorf tower will become Miami’s tallest
Siguiente
Siguiente